One partner. Six steps. Zero guesswork.

From the first site walk to the final warranty, Energie Solutions handles every step of a commercial electrification project — lighting, controls, electrical, and preventive maintenance. Turnkey. Single point of accountability.

1
1-3 days

Free Audit

We walk the property, count every fixture, record wattage, map poles, measure pole heights, and document current lighting condition. For exterior work we drone-document the before state. No cost, no obligation, no commitment.

  • Full fixture inventory
  • Wattage and burn-hour math
  • Before-state photo and drone documentation
  • Preliminary savings estimate
A gloved hand holding a light meter under existing fixtures during a site walk.
2
1-2 weeks

Design & Spec

Our engineering team produces an IES-compliant photometric design with fixture selection, pole placement, foot-candle modeling, and uniformity ratios. Every spec is calibrated to your specific burn hours, building type, and visual requirements.

  • Photometric lighting plan
  • Fixture schedule with manufacturer spec sheets
  • IES RP-8-22 compliance documentation
  • Engineered drawings stamped where required
A photometric plan showing modelled light levels across a site.
3
1-4 weeks

Incentives & Rebates

Before a single fixture is ordered, we pull every applicable utility rebate, tax incentive, and financing program. TVA EnergyRight, Duke Smart $aver, Entergy programs, and applicable federal or state incentives — we apply for them, not you.

  • Utility rebate applications filed
  • Pre-approval secured before install
  • Financing options presented
  • Updated financial model with net project cost
A retail center lit at night, photographed from the air.
4
1-6 weeks

Install

Our licensed electricians execute the install on the schedule you need — after hours, weekends, or school-break windows. Every site is treated with operational respect: no downtime, no dust, no disruption to your tenants, customers, or patients.

  • Phased install schedule
  • Daily progress updates and photos
  • Old fixture removal and recycling
  • After-state documentation
An electrician working from a lift on a pole-mounted fixture.
5
1-3 days

Commission

Every fixture is tested, aligned, and commissioned. Controls are programmed to your schedule. IES compliance is verified with on-site foot-candle measurements. Warranty documentation is assembled. You get a walkthrough before we leave.

  • Foot-candle verification report
  • Controls schedule documentation
  • Warranty pack with every spec sheet
  • Final walkthrough and acceptance
A ceiling-mounted occupancy sensor being commissioned.
6
Ongoing

Service & Warranty

Most projects include a 5-10 year fixture warranty plus ongoing service contracts if you want them. Warranty claims are handled by us, not the manufacturer. Controls issues are resolved remotely when possible. Annual inspections keep the system running at spec.

  • 5-10 year fixture warranty
  • Optional ongoing service contract
  • Remote controls diagnostics
  • Annual inspection and tuning
A wall pack fixture mounted on a building exterior after dark.

Start with the free audit.

Step 1 is free, obligation-free, and typically takes 1-3 days to turn around. Everything else is built on what we find there.